ISO Class 8 Clean Room
- On 17th January 2015
Airology have successfully completed the design, supply, installation and commissioning of an ISO Class 8 Clean Room Facility for a UK Defence Contractor.
The ‘turnkey’ package included partitioning, flooring, walk on ceiling, close control air handling, filtration, temperature control, specialist crane, electrical distribution and validation on completion.
Andrew Benson, Director of Airology Systems, commented….. “This was a particularly interesting project given the constraints set by the client on the materials used for the design and construction of the clean room”. “We worked very closely with our client for the duration of the contract period to ensure that their exacting requirements were met”.