Design & Build ISO Class 6 Clean Room Facility

Project Description

Design & Build ISO Class 6 Cleanroom Facility

Project objective: With a requirement to bring in-house a product previously out-sourced, our client, a leading provider of cleanroom garments, consumables and medical devices to the healthcare sector, chose us as Principal Contractor and consultant for a new ISO 6 cleanroom build in Lincolnshire.

The requirement was for an ISO Class 6 / EU GMP Grade C cleanroom facility with a two stage changing facility, interlocked goods-in transfer, temperature control, HEPA filtration, pressure monitoring and night set back capability to maintain a constant condition within the room and ensure energy efficiency.

The process: We were appointed as Principal Contractor to help design and build an ISO class 6 cleanroom facility to enable our client to meet their new requirement within a modern industrial unit.

After extensive surveying of the empty warehouse, we worked with our client over a number of weeks to finalise a design that would ensure a constant condition, high quality standards and a fast turnaround of products in line with ISO 6 class 6 cleanroom requirements. Particular attention was given to pressure monitoring to compensate for pressure fall and increase.

Results: Following successful installation and validation of the new cleanroom facility, our client has benefited from:-

  • Lower energy costs due to the night set back facility
  • The ability to closely monitor pressure changes with notification of pressure fluctuation
  • Reduced costs as outsourcing has been decreased
  • Capability to grow the business and meet the growing demands of the industry

Call us now if you have a need for an ISO class 6 cleanroom or for any cleanroom and ventilation requirement including air conditioning, ventilation and extraction.

Project Details

    Simply get in touch and we will explain the benefits and innovative solutions we can bring to your air technology requirements.

    GET IN TOUCH