news

latest news

Design & Build ISO 7 Clean Room Facility

Design & Build ISO 7 Clean Room Facility

18th May 2017

Design & Build ISO 7 Clean Room Facility for Surgical Instrument Supplier

Learn More >
Energy Efficient Heat Recovery VRF Comfort Cooling & Heating System

Energy Efficient Heat Recovery VRF Air Conditioning

19th Jan 2017

Replacement Energy Efficient VRF Air Conditioning to Offices

Learn More >
Clean Room Facility

Design and build of new clean room facility

9th Jan 2017

With limited available space and an urgent need to expand, our client requested our recommendations

Learn More >
7 Key Decisions

7 Key Decisions when creating a clean room

4th Oct 2016

Kick start your decision making process NOW

Learn More >
Need advice about your Cleanroom or Air conditioning?
Get in touch
Thank you

A member of Airology Systems will respond shortly.

Sorry

There has been a problem sending your email, please email info@airology.co.uk directly.

news archive

2016

Office Air Conditioning Installation

Design, supply, installation and commissioning of air conditioning systems

For a leading property developer, Airology has completed the design, supply, installation and commissioning of air conditioning systems to Oakenshaw House - an exclusive office building in Redditch, Worcestershire. The Project included de-commissioning the existing air conditioning followed by the installation of new high efficiency heat pump inverter air conditioning to all floors.

Clean Room Air Conditioning, Filtration & Ventilation Systems

Cleanroom Production Facility Air Conditioning, Filtration & Ventilation Systems

Airology have completed the design, supply, installation and commissioning of air conditioning, filtration and ventilation systems to a clean room production facility for a pharmaceutical manufacturer.

The project included air conditioning, filtration and ventilation systems, HEPA filters, fire rated duct droppers and filters to an ATEX suite, digital Magnehelic gauge monitoring, commissioning and validation.

Clean Room Upgrade to ISO Class 5

Refurbishment and upgrade of cleanroom facility to ISO Class 5

Airology Systems has completed the installation and commissioning of an uprated cleanroom facility for a manufacturer in fluid and gas control, flow technology and value engineering. The 150m2 facility was previously rated as class 1000 with localised areas rated at class 100.

A refurbishment and upgrade of the cleanroom now facilitates ISO class 5 (old class 100) throughout the area and was actually tested at ISO class 4 (old class 10).

This consistent air quality throughout the entire cleanroom ensures that all fabrication is conducted under the same stringent conditions and not in local areas which can be susceptible to potential contamination.


ISO 7 Clean Room

Airology completed the installation of a class ISO 7 clean room to a new production facility

The clean room solution provided included filtration, air conditioning, wet bench extract and suspended ceilings for a supplier of ultra-thin membranes and related lithographic products.

2015

VRF Air Conditioning & Ventilation

​Airology completed the supply, installation and commissioning of VRF air conditioning, ventilation and extract systems for the Engineering Employers Federation.

The solution provided included the installation of a VRF air conditioning system, server room split air conditioning, centralised controllers, ventilation to classrooms, offices, breakout areas and workshop heating and ventilation.

ISO Class 8 Clean Room Facility

​The design, supply, installation and commissioning of an ISO Class 8 Clean Room Facility for an injection moulding and clean environment packaging specialist in Birmingham.

Previously a store room, the conversion project was managed entirely by Airology and completed to a very high specification. The company are now ready for business as an award winning clean room having been successful in beating the competition to a coveted Manufacturing Achievement Award.

ISO Class 8 Clean Room

Airology have successfully completed the design, supply, installation and commissioning of an ISO Class 8 Clean Room Facility for a UK Defence Contractor.

The 'turnkey' package included partitioning, flooring, walk on ceiling, close control air handling, filtration, temperature control, specialist crane, electrical distribution and validation on completion.

Andrew Benson, Director of Airology Systems, commented..... "This was a particularly interesting project given the constraints set by the client on the materials used for the design and construction of the clean room". "We worked very closely with our client for the duration of the contract period to ensure that their exacting requirements were met".

Clean Room Installation

Airology has completed the supply and installation of a complete 'turnkey' packaged clean room facililty for Micronclean, Skegness.

The clean room is to be used for the manufacture of alcohol trigger sprays and pre-impregnated wipes for the pharmaceutical maket.

Our works included the design, supply, installation and commisioning of a mezzanine floor, partitioning, ceiling, ISO Class 6 HEPA filtration system (Class 1000), lighting, small power, data and benching.

Validation Services

As part of Airology Systems 'turnkey' project services, we undertake particle counts, DOP tests and validations to ISO, Federal and GMP standards.

Pictured here are Bernard Etheridge assisted by Melissa Benson of Airology Systems undertaking a particle count and validation of a recently completed ISO Class 8 clean room facility.

Anyone for Cricket

Airology are pleased to sponsor Avoncroft Cricket Club.

Avoncroft run two sides on a Saturday in the Worcester County League, one side on a Sunday also in the Worcester County League. They have under 15 years, 10 years and 9 years junior sides and are always looking for new member's of the club both playing and social.

Air Conditioning Installation

We have completed the installation of air conditioning to an office building in Derby.

Our works included the design, supply, installation and commissioning of energy inverter heat pump air conditioning and fresh air input systems.

Great Manchester Run

Congratulations to Airology Project Manager Soner Sari for successfully completing the 2014 Great Manchester Run.

As Europe's biggest 10k running event more than a quarter of a million enthusiastic runners took to the streets of Manchester earlier this month.

A keen runner, Soner combines his hobby with raising money for his chosen charity Leukoemia Lymphoma Research.

Laboratory Solutions

For a Pharmaceutical Distributor, we have recently completed a full Laboratory facility constructed on an existing mezzanine floor to make use of the limited space available.

Our works included, room construction, suspended ceiling, floor covering, lighting, fire detection, electrical works, air conditioning, fresh air ventilation, benching and plumbing.

ISO Class 8 Clean Room Facility

​Airology Systems have completed the design, supply, installation and commissioning of an ISO Class 8 Clean Room Facility for a UK Aerospace Manufacturer.

Our client commented "We are delighted with the whole clean room project from initial site meeting through to final validation. The standard of workmanship has been excellent and the focus on customer satisfaction is unrivalled".

2014

Complete Turnkey Package Solution

We have recently completed the installation of a treatment facility for a leading cosmetic surgery.

Located in a Victorian townhouse, Airology Systems provided a full refurbishment of the basement with the formation of treatment and pre-treatment rooms, sterile stores, sluice room, toilets and changing rooms.

Air Conditioning & Mechanical Services Installation

For a leading commercial property developer, we have completed the installation of air conditioning and mechanical services to three floors of a prestigious office building in Coleshill, Birmingham.

Our works included the design, supply, installation and commissioning of air conditioning, fresh air input system to the building, high efficiency boiler to provide heating to circulation spaces, hot water calorifier supplying WC's and vending points and over door heater.

Retail Air Conditioning Installation

​We have recently completed the supply and installation of air conditioning to two new retail outlets in Piccadilly and Sloane Street, London for Austrian Jeweller FREY WILLE.

We have also been awarded the service and maintenance contract for the air conditioning equipment installed to ensure that it operates to optimum efficiency.

Air Conditioning & Ventilation

Airology have completed the design, supply, installation and commissioning of 26 no.

Indoor heating/cooling inverter ducted air handling units configured in a single/twin arrangement to two floors of a prestigious office building in Redditch, Worcestershire. The air handling units were connected to 14 no. outdoor condensing units. The existing fresh air input system to the building was modified to accommodate the installation of the new air handling units.

2013

Medical Centre Air Conditioning & Ventilation

Airology has successfully completed the design, supply, installation and commissioning of Air Conditioning, Ventilation and Building Management Systems for Pall Mall Medical Centre in Cheshire.

The solution provided by Airology included Air Conditioning, Ventilation, BMS, Air Handling and Theatre Supply and Extract Systems.

ISO Class 6 Clean Room Facility

Airology Systems has successfully completed the design, supply, installation and commissioning of a"turnkey" ISO Class 6 Clean Room Facility and ISO Class 5 localised air shower for Redditch Medical a division of Entaco Ltd.

The 'turnkey' package provided by Airology Systems included Clean Room, Partitioning, Flooring & Ceiling, Close Control Air Handling & Filtration, ATEX rated Ventilation System, Temperature Control, ISO5/6 Enclosure, Lighting & Power Sockets, Water Services, Fire Alarm System and Validation on completion.

Andrew Stringer, Managing Director of Entaco commented..... "Throughout the project Airology provided us with guidance and expertise to ensure that the installation met our specific requirements and was completed on time. We are delighted with our state of the art Clean Room and the professional approach and support given to us by the Airology team was invaluable."

2012

ISO Class 8 Clean Room Facility

​Airology have completed the design, supply, installation and commissioning of an ISO Class 8 Clean Room Facility for an aerospace manufacturer based in Scotland.

The complete package provided included clean room partitioning, flooring, walk on ceiling, close control air handling and filtration, temperature control, pressure monitoring, specialist gases, bespoke benching, lighting & power sockets and validation on completion.

ISO Class 7 Clean Room Facility

Airology have completed the design, supply, installation and commissioning of an ISO Class 7 Clean Room Facility for a single use surgical instruments manufacturer.  The 'turnkey' package included partitioning, flooring, suspended ceiling, air conditioning, air filtration, pressure monitoring, lighting, electrical distribution and validation on completion.

Airology have completed the design, supply, installation and commissioning of an ISO Class 7 Clean Room Facility for a single use surgical instruments manufacturer. The 'turnkey' package included partitioning, flooring, suspended ceiling, air conditioning, air filtration, pressure monitoring, lighting, electrical distribution and validation on completion.

"Airology provided us with a bespoke, managed development which has allowed us to double our production output. The service and communication which we received at all stages of the project was excellent and any impact on our production was kept to an absolute minimum. We would definitely recommend Airology" commented our client.

2011

Great North Run Congratulations to Soner Sari

Congratulations to Airology's Project Manager Soner Sari for completing the 2011 Great North Run.

Soner ran up to 30K per week during training and finished the run in 2 hours 20 minutes coming a respectable 24136 out of 54000 runners.

At the finish, Soner commented "It was a hard run but I completed without stopping or walking!" "The weather wasn't too bad with rain holding off until about the 9 mile mark".

Soner has successfully raised over £1000 for Leukoemia Lymphoma Research.

ISO Class 8 Clean Rooms

​Airology has completed the design, supply, installation and commissioning of two 'turnkey' ISO Class 8 Clean Room Facilities for a medical device manufacturer based in Bristol.

The 'turnkey' package included clean room partitioning, flooring, walk on ceiling, close control air handling and filtration, temperature control, pressure monitoring, lighting, power and validation on completion.

New Clean Room Facility in 6 weeks

ISO Class 7 Clean Room

Airology Systems have completed the supply and installation of a clean room facility for Xograph Healthcare in Gloucestershire. Xograph provide innovative medical imaging technology and services to hospitals, diagnostic centres and veterinary practices throughout the UK.

'From placing an order to finished validated clean room in only six weeks' - 'this is an outstanding achievement' commented Mr Neil Cant, Managing Director of Xograph.

2008

Andrew Swift Celebrates 10 years with Airology

​Congratulations!, This year Andrew Swift celebrates 10 years with Airology Systems.

Andrew joined Airology in 1998 from the health service and has played a key part in developing the business, in particular, design and estimating of major projects.

His experience in the health and medical sector compliments Airology's knowledge in the design, supply and installation of air conditioning, clean rooms and specialist 'turnkey' projects.

Pictured, Managing Director Andrew Benson congratulates Andrew (right) on his 10 years service with Airology.

Office Relocation

​We have moved!

After many months of searching, we have found the ideal property to enable Airology to develop and expand for the future.

On 28th April, 2008, Airology relocated to The Cart Block - one of the original 19th Century buildings which forms part of the Chestnut Court development in Sambourne, Warwickshire.

Our new location retains our central position within the United Kingdom and ensures we can continue to provide a high level of service to existing and new customers alike.

Please note our new contact details at the top and bottom of this page.

2007

Airology support the RNLI

For 2007 our chosen charity was the RNLI, in recognition of the fantastic service they provided during the summer  2007 floods.

Together with leading air conditioning manufacturer Mitsubishi Electric, we made a joint £500 donation to the charity.

The RNLI is entirely funded by charitable and voluntary contributions and we are delighted to support this extremely worthwhile cause.

Health and Safety Matters

​Following the updated CDM regulations, which came into force April 2007, we expanded our team in July to include health and safety consultant John Garnett from Principal Safety.

Now acting as Airology's health and safety advisor, his role ensures we maintain our understanding of our roles and responsibilities in relation to health and safety legislation compliance.

With Principal Safety's assistance we have formulated a health and safety action plan which has included a training matrix. As a result, we have recently undertaken two days of training for all staff here in Warwickshire.

Flying high with Airology

​Airology have supported the 216 (Redditch) Squadron Air Training Corps by providing new T-shirts for training events. So far the Squadron has been putting to them good use by wearing them for Wing Athletics at DCAE Cosford.

The Air Cadets are celebrating again , having won their second competition in two months. The team of 4 came top in the Wales and West Regional Adventure Training Competition, beating 5 other teams from all round the country.

The annual event took place in Snowdonia National Park over 2 days. Day 1 involved a thorough kit inspection for the self-sustained exhibition, first aid and written navigation tests followed by a 16 kilometre trek. After a wet night under canvas in the rain , on the second day the group had to contend with a further trek of 18 kilometres before returning to their start point.

This is the first time ever that a mixed team has won the competition and we send our congratulations to the Squadron and all involved!