Project Overview

Airology Systems was appointed to transform an existing office environment into a purpose-built cleanroom facility to support a specialist manufacturing process. The project required the complete reconfiguration of the existing space to create a fully integrated cleanroom incorporating multiple ISO classified environments, specialist services and validated environmental control systems.

Designed to operate continuously in the unmanned, non-operational state, the new facility provides controlled manufacturing areas with positive pressure, H14 HEPA filtration and carefully managed airflow to meet the required cleanliness classifications.

The Challenge

The client required a modern cleanroom facility capable of accommodating several manufacturing processes within one integrated environment. The design needed to achieve different ISO classifications across individual rooms whilst maximising the available footprint and integrating specialist mechanical and electrical services to support production equipment.

The project also required dedicated gowning and storage areas, hygienic finishes throughout and the flexibility to support future operational requirements.

The Solution

Working closely with the client throughout the design and construction process, Airology Systems delivered a complete turnkey cleanroom solution tailored to the operational requirements of the facility.

The installation included the construction of new insulated cleanroom walling with hygienic finishes, specialist cleanroom doors, seamless vinyl flooring with cap and coved skirting, ceiling modifications and the installation of a high-performance H14 HEPA filtration system.

Individual cleanroom areas were designed to achieve ISO 6, ISO 7 and ISO 8 classifications, each with dedicated recirculatory air systems, controlled air change rates and positive pressure to provide the required environmental performance.

Specialist filtration systems were incorporated to provide additional make-up air for production equipment, with intelligent electrical interlocking ensuring the systems operate only when required, improving both efficiency and operational control.

The project also included the installation of stainless steel mechanically interlocked pass-through hatches, magnetic door interlocking, compressed air services, electrical power distribution, data infrastructure, pressure monitoring, water and drainage services and bespoke hygienic workstations to provide a complete operational cleanroom environment.

The Outcome

Following completion, the facility was fully commissioned, balanced and validated to the required ISO classifications, providing the client with a modern, reliable cleanroom environment designed to support specialist manufacturing operations.

The completed installation delivers:

  • Multi-room ISO classified cleanroom environments
  • H14 HEPA filtration with controlled airflow
  • Positive pressure throughout the facility
  • Specialist services integrated for manufacturing equipment
  • Hygienic construction using cleanroom compliant materials
  • Validated environmental performance
  • A flexible, future-ready cleanroom designed for long-term operational reliability

Scope of Works

  • Cleanroom Design
  • Office to Cleanroom Conversion
  • Hygienic Construction
  • Steel-Faced Cleanroom Walling
  • Cleanroom Doors
  • Hygienic Vinyl Flooring
  • Ceiling Modifications
  • H14 HEPA Filtration Systems
  • Positive Pressure Control
  • Environmental Air Distribution
  • Pressure Monitoring
  • Stainless Steel Pass-Through Hatches
  • Electrical Installation
  • Power & Data Distribution
  • Compressed Air Services
  • Water & Drainage Services
  • Hygienic Workstations
  • Commissioning & Validation
  • Operating & Maintenance Documentation

Other Case Studies…

Paragraf, Somersham - ISO 6 & ISO 8 Cleanrooms

They required a GMP Grade B, C and D cleanroom facility with temperature control, filtration, pressure monitoring and ventilation.

Read case study

Xeal Pharma, ISO 7 Multiroom Cleanroom, Birmingham

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in pharmaceutical production and distribution, requested our recommendations.

Read case study

Blink Medical / Corsa Medical, ISO 7 Cleanrooms, Solihull

We were appointed to help design and build an ISO 7 cleanroom facility to enable our client to manufacture products in house and create a quality control office to maintain their high quality standards.

Read case study

Exstent Ltd, ISO 5, ISO 6 & ISO 7 cleanroom, Tewkesbury

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in personalised external aortic root support, requested our recommendations.

Read case study

Automotive, ISO 7 Cleanroom, Bolton

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanroom, Somerset

We were appointed to design and build a cleanroom facility along with quality review space to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Testcard, ISO 8 Cleanroom, Scarborough

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in at-home medical testing providing immediate test results at a low cost, requested our recommendations.

Read case study

Andel Plastics Ltd, ISO 8 Cleanroom, Birmingham

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist injection moulding and toolmaking company, requested our recommendations.

Read case study

Microsystems UK, ISO 7 Cleanroom, Warrington

Airology were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production and administration within their new premises.

Read case study

Trackwise, ISO 7 Cleanroom, Tewkesbury

We were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production.

Read case study

Always Pure Organics, ISO 8 Cleanroom, Manchester

We were appointed to help design and build an ISO 8 cleanroom facility to enable our client to manufacture products in house to maintain their high quality standards.

Read case study

Sheffield University, ISO 7 Cleanroom, Sheffield

Sheffield University required an ISO 7 cleanroom facility with temperature control and filtration to prevent contamination during testing, ensure high quality standards and efficient data analysis.

Read case study

Aerospace, Cleanroom Design, Somerset 2015

The client required an existing manufacturing space to be converted in an ISO 8 cleanroom facility with temperature control, filtration and pressure monitoring.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanrooms, Somerset 2020

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Spa Medica – Worcester

Airology Systems were appointed to design and install the air handling systems for theatre and treatment rooms at Spa Medica Eye Hospital in Worcester.

Read case study