Fresh air input systems – We can design and install fresh and healthy working environments by supplying fresh, filtered air into a building.

What our customers say…

“Throughout the project Airology provided us with guidance and their expertise to ensure that the installation met our specific requirements and was completed on time. We are delighted with our state of the art Clean Room and the professional approach and support given to us by the Airology team was invaluable.”

Andrew Stringer Managing Director, Entaco Ltd

“During the initial design and build we worked closely with Airology to create a facility that will provide one of the most comprehensive GMP stability storage and testing services in Europe. Working with Airology as the principal contractor enabled us to deliver a significant building project, on-scope, on-time and on-budget.”

Mark HammondManaging Director, Intertek Melbourn Scientific

“We have used Airology extensively to install air conditioning in Grosvenor House so wanted them to handle the M & E but we also wanted a single locally based supplier for the refurbishment contract.  Airology were able to provide a comprehensive service including the raised floor, ceilings, decoration and carpeting as well as the M & E  and the project came in on budget, on time and the quality was excellent.”

Mark RobertsManaging Director, Loxton Developments Ltd

“Airology provided us with a bespoke, managed development which has allowed us to double our production output. The service and communication which we received at all stages of the project was excellent and any impact on our production was kept to an absolute minimum. Malosa Medical would definitely recommend Airology.”

Will Stewart Operations Manager, Malosa Medical

“Airology completed our installation with a high degree of professionalism and knowledge. P3 would have no hesitation in recommending the company for similar projects.”

Simon TalbotManaging Director, P3 Medical Ltd

“We would like to thank you for the way the works were carried out to a high standard with the minimum of disruption. From concept to completion your staff were very helpful and professional throughout. We would be pleased to recommend you in the future without hesitation.”

Dr SilvaPerfect Image Consultants

“The quality of the work has been to a high standard and the people who have worked on the project have been exceptional. There were some challenges to be dealt with, but as we thought the Airology team was first class at solving the problems and kept the project to time and to budget.”

Nigel SouthernRidgeway Biologicals

Our Portfolio…

Paragraf, Somersham - ISO 6 & ISO 8 Cleanrooms

They required a GMP Grade B, C and D cleanroom facility with temperature control, filtration, pressure monitoring and ventilation.

Read case study

Xeal Pharma, ISO 7 Multiroom Cleanroom, Birmingham

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in pharmaceutical production and distribution, requested our recommendations.

Read case study

Blink Medical / Corsa Medical, ISO 7 Cleanrooms, Solihull

We were appointed to help design and build an ISO 7 cleanroom facility to enable our client to manufacture products in house and create a quality control office to maintain their high quality standards.

Read case study

Exstent Ltd, ISO 5, ISO 6 & ISO 7 cleanroom, Tewkesbury

With a urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in personalised external aortic root support, requested our recommendations.

Read case study

Automotive, ISO 7 Cleanroom, Bolton

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanroom, Somerset

We were appointed to design and build a cleanroom facility along with quality review space to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study

Testcard, ISO 8 Cleanroom, Scarborough

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist in at-home medical testing providing immediate test results at a low cost, requested our recommendations.

Read case study

Andel Plastics Ltd, ISO 8 Cleanroom, Birmingham

With an urgent requirement to expand their production facility to meet their increased demand, our client, a specialist injection moulding and toolmaking company, requested our recommendations.

Read case study

Microsystems UK, ISO 7 Cleanroom, Warrington

Airology were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production and administration within their new premises.

Read case study

Trackwise, ISO 7 Cleanroom, Tewkesbury

We were appointed to design and build a cleanroom facility to enable our client to expand their business and meet their growing demands by creating a larger space for production.

Read case study

Always Pure Organics, ISO 8 Cleanroom, Manchester

We were appointed to help design and build an ISO 8 cleanroom facility to enable our client to manufacture products in house to maintain their high quality standards.

Read case study

Sheffield University, ISO 7 Cleanroom, Sheffield

Sheffield University required an ISO 7 cleanroom facility with temperature control and filtration to prevent contamination during testing, ensure high quality standards and efficient data analysis.

Read case study

Aerospace, Cleanroom Design, Somerset 2015

The client required an existing manufacturing space to be converted in an ISO 8 cleanroom facility with temperature control, filtration and pressure monitoring.

Read case study

Aerospace, ISO 7 and ISO 8 Cleanrooms, Somerset 2020

We were appointed to design and build a cleanroom facility to enable our client to continue expanding their business and meet their growing demands by utilising their existing space more efficiently.

Read case study